Production Line & Equipment

Robotic welding, automated coating and an in-house testing lab — 12,000 frames per month under one 40,000 m² roof.

Production Line & Equipment
Our factory is equipped with a complete production line for commercial fitness equipment. Every GreeFitness frame starts in our 16 robotic MIG welding cells, where automated MIG welding ensures consistent penetration. Jig-controlled assembly stations hold tolerances to ±0.5mm, followed by 100% fixture inspection before powder coating. With a monthly capacity of 12,000 frames, we handle both trial orders and bulk orders efficiently.

Key Features

  • 16 Robotic MIG Welding Cells

  • Automated MIG welding ensures consistent penetration and high-strength joints for every frame.

  • 12,000 Frames per Month

  • Large production capacity supports both small trial orders and full container loads.

  • Jig-Controlled Assembly with ±0.5mm Tolerances

  • Precision assembly stations guarantee accurate fit and alignment.

  • 100% Fixture Inspection Before Powder Coating

  • Every frame is checked before entering the coating line, eliminating defects early.

  • Flexible OEM/ODM Support

  • Custom logos, colors, packaging, and new product development available.